Accueil
Catégories
> Réservoirs (récipients) -- Conception et construction
Réservoirs (récipients) -- Conception et constructionVoir aussi |
Ajouter le résultat dans votre panier Affiner la recherche
Etendre la recherche sur niveau(x) vers le bas
Manufacturing overview of a 2.4 mater (7.9 foot) composite cryotank / D. A. McCarville in SAMPE JOURNAL, Vol. 49, N° 5 (09-10/2013)
[article]
Titre : Manufacturing overview of a 2.4 mater (7.9 foot) composite cryotank Type de document : texte imprimé Auteurs : D. A. McCarville, Auteur ; J. C. Guzman, Auteur ; J. L. Sweetin, Auteur ; J. R. Jackson, Auteur ; L. Pelham, Auteur ; J. Steenland, Auteur ; C. W. Petersen, Auteur Année de publication : 2013 Article en page(s) : p. 7-13 Note générale : Bibliogr. Langues : Américain (ame) Catégories : Avions -- Matériaux
Composites à fibres
Contrôle non destructif
Hors autoclave (technologie)
Industries aérospatiales -- Matériaux
Procédés de fabrication
Réservoirs (récipients) -- Conception et construction
StratifiésIndex. décimale : 620.11 Matériaux (propriétés, résistance) Résumé : As part of the Space Technology Game Changing Development Program (GCDP) Composite Cryotank Technology Development (CCTD) contract, Boeing fabricated a 2.4 m diameter test article as a precursor to a 5.5 meter cryotank design, fabrication, and test. This component encompasses several challenging design features: (a) one-piece co-cured/co-bonded spherical geometry with integral skirts, (b) out-of-autoclave curing materials, (c) permeation resistant thin/hybrid ply laminate skins, and (d) thin and thick off-angle slit tape (tow) construction. The component was built on a 24 piece collapsible composite tool using robotic fiber placement. This paper details the tooling and manufacturing flow with an emphasis on process development building block activities. Cessons leamed are compiled that will be used to help guide the build of a 5.5 m diameter tank during the next phase of the CCTD contract. Note de contenu : - INTRODUCTION : CCTD program background - Cryotank design overview - Cryotank manufacturing overview
- PRECURSOR TANK TOOLING : Tank tool design - Spindle and skirt tooling - Tank tool fabrication
- PRECURSOR MANUFACTURING : Manufacturing summary - Facilities and equipment - Tank automated fiber placement - Fluted core manufacture - Cryotank nondestructive inspectionPermalink : https://e-campus.itech.fr/pmb/opac_css/index.php?lvl=notice_display&id=19262
in SAMPE JOURNAL > Vol. 49, N° 5 (09-10/2013) . - p. 7-13[article]Réservation
Réserver ce document
Exemplaires (1)
Code-barres Cote Support Localisation Section Disponibilité 15385 - Périodique Bibliothèque principale Documentaires Disponible Maximizing water tank service life using a design-build approach / Dan Zienty in JOURNAL OF PROTECTIVE COATINGS & LININGS (JPCL), Vol. 31, N° 5 (05/2014)
[article]
Titre : Maximizing water tank service life using a design-build approach Type de document : texte imprimé Auteurs : Dan Zienty, Auteur Année de publication : 2014 Article en page(s) : p. 42-50 Langues : Américain (ame) Catégories : Applications extérieures
Châteaux d'eau
Conception technique
Entretien et réparations
Evaluation visuelle
Qualité -- Contrôle
Réservoirs (récipients) -- Conception et construction
Réservoirs (récipients) -- revêtements protecteurs
Revêtements intérieurs:Peinture intérieureIndex. décimale : 667.9 Revêtements et enduits Résumé : They say there is more than one way to skin a cat. That same analogy holds true when considering the maintenance of a water tower. There are numerous approaches including direct selection, traditional design-bid-build, and design-build. Each approach holds merit, and before making the selection, an owner should carefully weigh the advantages and disadvantages of each. Some of these advantages and disadvantages are discussed in a previous article, "Old Tanks, Small Towns, Tight Budgets" (JPCL, May 2005).
The sole purpose of selecting from any of the above approaches is simple: to maximize the service life of the water tower's applied coating system. Selecting an approach may be easier when the scope of work is based on the complete reconditioning or restoration of the facility. The contractor begins with a clean slate, and it is easy to identify where the responsibility lies should there be a premature failure. However, often times this approach is just not possible, and what may be referred to as aggressive maintenance is warranted at the system's approximate half-life.
In 2006, SEH embarked on the design-build method of delivery for water storage tanks, and partnered with a Midwestern contractor. One of the first projects in the program was a 300,000-gallon water spheroid in the City of Eagle River, Wisconsin (referred to from this point forward as "the City.") The tank was last painted in 1991, making the existing coating system 15 years old. The first step prior to developing the project proposal, was conducting a com-prehensive inspection of tank surfaces in accordance with AWWA D101, including interior immersion, interior dry (access tube, riser, and base), and accessible exterior areas. Tank appurtenances were also evaluated for compliance with current AWWA and OSHA requirements.
This article will review the design-build approach to developing and executing a maintenance plan to maximize the tank's coating system service life even beyond the recommended 15 to 20 years.Permalink : https://e-campus.itech.fr/pmb/opac_css/index.php?lvl=notice_display&id=21643
in JOURNAL OF PROTECTIVE COATINGS & LININGS (JPCL) > Vol. 31, N° 5 (05/2014) . - p. 42-50[article]Réservation
Réserver ce document
Exemplaires (1)
Code-barres Cote Support Localisation Section Disponibilité 16322 - Périodique Bibliothèque principale Documentaires Disponible
[article]
Titre : Stoving enamel - 9. Barrel paints Type de document : texte imprimé Auteurs : Mukund Hulyalkar, Auteur Année de publication : 2017 Article en page(s) : p. 110 Langues : Anglais (eng) Catégories : Peintures en baril
Produits commerciaux -- Stockage
Réservoirs (récipients) -- Conception et construction
Résistance des matériaux
Revêtement émail:Peinture-émail
Stabilité au stockageIndex. décimale : 667.9 Revêtements et enduits En ligne : https://drive.google.com/file/d/1zrSdn9VvaElyKei95GhJHyJFx8I3sSBE/view?usp=drive [...] Format de la ressource électronique : Permalink : https://e-campus.itech.fr/pmb/opac_css/index.php?lvl=notice_display&id=28464
in PAINTINDIA > Vol. LXVII, N° 4 (04/2017) . - p. 110[article]Réservation
Réserver ce document
Exemplaires (1)
Code-barres Cote Support Localisation Section Disponibilité 18866 - Périodique Bibliothèque principale Documentaires Disponible Tanks : the what, where and why of coating system selection / Kristin Leonard in JOURNAL OF PROTECTIVE COATINGS & LININGS (JPCL), Vol. 33, N° 8 (08/2016)
[article]
Titre : Tanks : the what, where and why of coating system selection Type de document : texte imprimé Auteurs : Kristin Leonard, Auteur Année de publication : 2016 Article en page(s) : p. 31-37 Note générale : Bibliogr. Langues : Américain (ame) Catégories : Acier au carbone
Copolymère vinyle ester
Epoxydes
Polyuréthanes
Réservoirs (récipients) -- Conception et construction
Réservoirs (récipients) -- revêtements protecteurs
Revêtements organiques
Soudures
ZincIndex. décimale : 667.9 Revêtements et enduits Résumé : When selecting protective coatings for chemical storage tanks, various issues come into play such as the location of the tank fabrication, the construction sequencing, operating parameters, intended service life, construction materials and the stored material. This article explains the effects of each factor on coating selection and presents various design scenarios and material recommendations. Note de contenu : - Shop fabrication vs field erection
- Shop fabrication
- Field fabrication
- Shop fabricated - Field erected : Design 1. Shopt blas + IOZ primer/field-up + topcoat - Design 2. Shop blast + ZRE/field preparation + touch-up + topcoat - Design 3. Shop blast + PCP/field preparation + field prime + topcoat - Field weld preparation and coating
- TANK FLOOR PLATES
- INTERNAL LININGS
- SPECIALTY TANK DESIGNS
- FIGURES : 1. Concrete exterior of a liquefied natural gas (LNG) tank - 2. Shop primed-field erected tanks showing field weld stripe coats and touchup - 3. LNG 9-percent nickel inner tank with pre-construction primer - 4. Interior carbon steel liner of an LNG tank
- TABLE : 1. Common coatings and linings used for carbon steel storage tanks - 2. Field weld coating procedures for exterior tank platesEn ligne : http://www.paintsquare.com/archive/?fuseaction=view&articleid=5884 Format de la ressource électronique : Web Permalink : https://e-campus.itech.fr/pmb/opac_css/index.php?lvl=notice_display&id=28398
in JOURNAL OF PROTECTIVE COATINGS & LININGS (JPCL) > Vol. 33, N° 8 (08/2016) . - p. 31-37[article]Réservation
Réserver ce document
Exemplaires (1)
Code-barres Cote Support Localisation Section Disponibilité 18252 - Périodique Bibliothèque principale Documentaires Disponible